2002 Established WANCHI Steel Pipe (Qinhuangdao) Co., Ltd
2003 Completed workshop construction and began equipment installation
2004 Acquired API5L  ISO9001 Approval
  Obtained the approval of the pipe production of the project of  natural gas transmission from West to East China
2005 Increased the capital to 26,430,000 USD,
  Awarded the Steel Piles of Caofeidian Mineral Port Phase I Project.  12000 tons
2006 Awarded East Siberia to West Pacific Crude Oil Pipeline (China-Russia)
2007

Acquired ARAMCO Approval

2008

Awarded China-Kazakhstan Crude Oil-Transmission Project Phase II & Mia-Asia Natural Gas-Transmission Project

2009 Acquired Laboratory Accreditation Certificate from CNAS and set up Metal Material Lab of WANCHI
  Set-up 3PE Plant
  Obtained HSE Certificate
2010 Acquired API 2B Approval
  Acquired Manufacturer License of Special Equipment People’s   Republic of China (Corrosion Protection Pressure Pipeline
  20 Cr Steel Pipe Production for Ningde , Yangjiang and  Fangcheng Port Nuclear Power Station
  Awarded  the Jubail Export Refinery Project-PROJ.2365 2A & 5B
2011 Obtained Myanmar-China Gas Pipeline Project (Myanmar Section)   150,000 tons
  Increased the capital to 29,430,000 USD
2012 Acquired PED Approval
  Obtained Myanmar-China Gas & Crude Oil Pipeline Project
  WANCHI participated in the 15th edition of the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC 2012) the Middle East's largest oil and gas exhibition which was held last November 11 – 14, 2012.
2013 Acquired Saipem Approval for structural pipes/piles and successes registered in Saipem "Vendor List"
  Acquired Abu Dhabi Water & Electricity (ADWEA) approval
  Acquired Kuwait Oil Company (KOC) Approval
2014 Acquired OHSAS18001:2007 and ISO 14001:2004
  Participated in Dusseldorf International Tube & Pipe Trade Fair-Germany
  Participated in the 6th All-China-International Tube & Pipe Industry Trade Fair in Shanghai
2015 Participated in the Offshore Technology Conference (OTC) 2015
  WANCHI participated in the 18th edition of the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC 2015)
  Acquired Kuwait National Petroleum Company (KNPC) Approval
  Acquired PTT Exploration and Production Public Company Limited (PTTEP) Approval
  Acquired SYNCRUDE Canada Ltd. Approval
2016 Participated in the Offshore Technology Conference (OTC) 2015


 
   
 
Tel: 86-335-5936000 FAX:86-335-5936006/002 ext 112/113 E-mail:market@wanchi.com.cn
NO.6.BEIJING ZHONGDAO THE ECONOMIC & TECHNOLOGICAL DEVELOPMENT ZONE SHANHAIGUAN QINHUANGDAO CITY HEBEI PROVINCE, P.R.CHINA. Register NO. : 冀ICP备14003467号